Systematica collaborated with Bjarke Ingels Group on the winning design entry for the last two parcels which will complete the development of City Life district by 2023, with new office and hotel spaces. The two buildings are designed in synergy with the three existing towers, emphasizing the relationship with the main axis of the development which connects the site with the surrounding district and main transport hubs. 

Besides the iconic portico, the project is characterized by a generous pedestrian area that gives access to the CityLife park, that welcome visitors and stitch the two buildings together.